Term · Intermediate
Bill of Materials
The full list of every material and component needed to make one garment.
A bill of materials, or BOM, lists every physical component of a garment: main fabric, lining, interfacing, thread, buttons, zippers, labels, hang tags and packaging. Each line gives the description, color, size, quantity per garment, placement and supplier. It usually sits inside the tech pack, and the factory uses it to order materials and to price the style accurately.
Also called BOM, materials list, trim list, bill of material
Related
- Tech PackThe spec sheet a manufacturer needs to produce a garment exactly as designed.
- Costing SheetA spreadsheet that adds up everything it costs to make and deliver one unit of a style.
- Care LabelThe sewn-in label that tells the owner how to wash, dry and iron a garment.
- Woven LabelA fabric label with the brand name woven in thread, sewn into a garment.
- Hang TagThe removable card tag attached to a new garment, carrying branding, size and price.